how we can find percentage of culvert during work progress to make bell of invoice.

in Bridge Engineering by  

1 Answer

0 votes

There are two common methods to work out the percentage of work progress:

  1. If the cross section of box culvert is quite uniform along its length, the work progress could be worked out by calculating length of box culvert completed over teh total length of box culvert.
  2. If the cross section of box culvert varies significantly along its length, you may monitor works progress by using volume of concrete poured against total volume of box culvert.