• Register
0 votes
what is the minimum value of CBR.
in Civil Engineering by  

1 Answer

0 votes
Min. CBR Value is 6. If the value for subgrade is less than 4, 300mm thick bolder solling is required (Base Corse). If the value for subgrade is less than 6, 75mm thick Jahama solling is required (Base Corse). If the value for subgrade is greater than 10, no treatment is required.
by  

Related questions

0 votes
0 answers 278 views
0 votes
2 answers 352 views
352 views asked Aug 11, 2015 in Engg. Materials by mfby2k  
0 votes
1 answer 382 views
382 views asked Aug 17, 2015 in Highway Design & Maintenance by mfby2k  
0 votes
0 answers 138 views
...