• Register
0 votes
find volume of earth work of a ramp having slope in 1:20 top width 3.5 m side slope 1:2 height of the existing road is 5.5 m and slope 1:3, pl answer with calculation
in Highway Design & Maintenance by  

Please log in or register to answer this question.

...