Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; qa_layer_9_from_layer_php has a deprecated constructor in /home/abouaayt/public_html/aboutcivil/answers/qa-include/qa-base.php(720) : eval()'d code on line 3
of /home/abouaayt/public_html/aboutcivil/answers/qa-plugin/user-management/layer.php What method you will adopt for checking alignment of columns in high rise buildings where each floor slab is project - Civil Engineering Technical Questions Answers - Ask a Civil Engineer
  • Register
0 votes
What method you will adopt for checking alignment of columns in high rise buildings where each floor slab is project
in Building Construction by  

1 Answer

0 votes
We can use total station.

Even plumbs can be used.

http://structuraldesignbs.blogspot.com/
by  

Related questions

0 votes
0 answers 95 views
95 views asked Aug 17, 2015 in Building Construction by mfby2k  
0 votes
1 answer 207 views
207 views asked Aug 17, 2015 in Building Construction by mfby2k  
...