How much gap is required between pouring casting of ground floor and pouring concrete for column
 
in Concrete Technology by  

1 Answer

0 votes
Usually it takes about 28 days for concrete to achieve its design strength but you can start column construction just after two weeks of finishing of ground floor because while construction of columns you would not be utilizing all the design strength at once.