how to estimate cost of 1meter cube brickwork?
in Civil Engineering by  

1 Answer

0 votes
For one meter cube of brickwork the materials required are 54.5kg of sand and 15.5kg of cement ie. 3 bags of sand and 1 bag of cement. The cost is estimated with the market value of the required amount of sand and cement.